PM-KUSUM: The 3 core scheme components
Structured overview of decentralized ground solar, standalone irrigation pumps, and grid feeder solarisation:
| Scheme Component | Eligible Capacity | Central + State Subsidy | Farmer Share |
|---|---|---|---|
| Component A (Decentralized Ground Solar) | 500 kW – 2 MW plants on barren/fallow land | Feed-in Tariff (PPA with DISCOM for 25 yrs) | Direct equity or developer lease rent |
| Component B (Standalone Solar Water Pumps) | Up to 7.5 HP DC/AC surface & submersible pumps | 60% (30% Central + 30% State govt) | 10% cash (30% bank loan option) |
| Component C (Grid-Connected Pump Solarisation) | Individual farmer pump solarisation & feeder solarisation | 60% (30% Central + 30% State govt) | 10% – 40% (sell surplus power to grid) |
Component B: Standalone solar pump subsidy benchmarks
Official benchmarks and farmer contribution breakdown for 3 HP, 5 HP, and 7.5 HP installations:
| Pump Capacity | Recommended Type | Benchmark Cost (Approx) | Combined 60% Subsidy | Farmer 10% Contribution |
|---|---|---|---|---|
| 3 HP Pump | Surface / Submersible DC | ₹1,65,000 – ₹1,90,000 | ₹99,000 – ₹1,14,000 | ₹16,500 – ₹19,000 |
| 5 HP Pump | Submersible AC / DC | ₹2,35,000 – ₹2,60,000 | ₹1,41,000 – ₹1,56,000 | ₹23,500 – ₹26,000 |
| 7.5 HP Pump | High-head Submersible | ₹3,20,000 – ₹3,60,000 | ₹1,92,000 – ₹2,16,000 | ₹32,000 – ₹36,000 |
How farmers apply for solar pumps
Standard state renewable development agency workflow:
State Renewable Energy Development Agency registration
Apply on your state nodal agency portal (e.g. Mahaurja in Maharashtra, RREC in Rajasthan, UPNEDA in UP, KREDL in Karnataka). Provide land 7/12 extract, Aadhaar, and borewell water source proof.
Verification of irrigation source & land ownership
District agricultural officers inspect your farmland to verify groundwater depth, non-electrified status, and pump sizing feasibility.
Contribution deposit & vendor allocation
Deposit the 10% beneficiary share into the designated state agency escrow account. The nodal agency assigns an empanelled solar pump vendor via e-tender.
Installation, testing and warranty handover
Vendor installs high-efficiency mono PERC panels, dual-axis manual tracking mount, motor pump, and remote monitoring unit (RMS) with 5 years free maintenance.
Frequently asked questions
Who is eligible for PM-KUSUM Component B standalone solar pumps?+
Can a farmer sell surplus solar power under PM-KUSUM?+
What is the warranty on PM-KUSUM solar pumps?+
Get quotes
Connect with verified installers serving your area. Free service.
Major state nodal agencies
Applications must be submitted via your respective state agency portal:
- • Maharashtra: MEDA (Mahaurja)
- • Gujarat: GUVNL / GEDA
- • Rajasthan: RREC
- • Uttar Pradesh: UPNEDA
- • Madhya Pradesh: MPUVN
- • Haryana: HAREDA